-
Budget Suggestions to Benefit the 3750 Community
WE WANT YOUR INPUT: Please Respond By June 1st As we move forward to develop next year’s budget, the Board would like shareholder suggestions about items to consider which would benefit the 3750 community. These suggestions should be items that would improve shareholder experience on a day-to-day basis, not large capital items, as they have been included in the…
-
Pool Closure Scheduled for cleaning and repairs
Please be advised that the pool is scheduled to close Monday, May 16th at 5am for necessary cleaning and repairs. It is expected to remain closed for approximately 5 days. Residents will be notified when the pool is reopened. We apologize for any inconvenience and thank you for your patience during this necessary pool closure.
-
Fire Escape Door Inspections and Measurements
Please be advised that the building architect and Wellington Construction will be inspecting and measuring the fire escape doors that will require replacement or remediation as part of the Life Safety requirements on Wednesday, May 11, 2016 beginning at 10:30am. The list of apartments they will require access to can be downloaded below. The A/B tier will be measured first,…
-
Apartment Front Door Lock Adjustments
As part of the outstanding Life Safety requirements, the Board has retained a contractor, Security Shop in conjunction with Wellington Construction, to remediate the apartment front door locks. Per the City of Chicago Municipal Code, all doors used in connection with exits must be arranged so they can be readily opened without the use of a key. Therefore, it is…
-
Voice Communications System Testing
Commercial Alarm Systems will be on site Tuesday, May 3rd and Wednesday, May 4th at approximately 9:00am to perform annual testing of the Voice Communication System to verify the operation of the smoke detectors and speakers. On Tuesday, May 3rd the smoke detection testing portion will be completed. Access to storage rooms in the basement will be required to test…
-
2016 Air Conditioner Maintenance and Inspection
As a reminder, all window and central air units must have an annual safety inspection as outlined in the 2016 safety inspection form.. The form is available from the website or receiving room, and the inspection needs to be completed by June 30, 2016. The purpose of the inspection is to ensure air conditioning units are installed correctly and have…